Back to South Carolina Power Details

Enoree Phase II Landfill Gas Recovery

biomass Power Plant
Greenville County, South Carolina
View on Google Maps (opens in a new tab)

Power Plant Data Source: EPA, Jan 2021

Quick Stats

Capacity
3.2 Megawatts
Annual Net Generation
9,136 MWh (Megawatt Hours)

Context: That's equivalent to the annual power demand of 831 American homes (11 MWh each, source: EIA (opens in a new tab))

Annual CO2 equivalent emissions
0 metric tons CO2 equivalent

Context: That's equivalent to the annual emissions of about 0 American cars (4.6 metric tons each, source: EPA (opens in a new tab))

Detailed Emissions

Annual CO2 emissions
0.000 metrics tons CO2
Annual SO2 (Sulfer Dioxide) emissions
2.055 tons
Annual NOx (Nitrogen Oxide) emissions
0.000 tons
Annual N2O (Nitrous Oxide) emissions
0.000 lbs
Annual CH4 (Methane) emissions
0.000 lbs